In our new visit to ISTON, on-site measurements for the energy and thermal modeling of the 3D-printed building have begun. Data loggers that will make long-term measurements in the building have been placed in a way suitable for recording in summer and winter, and the thermal measurements and photo shoots of the building have been completed. At the same time, the logistics of taking cores from the prototype walls printed in ISTON and transporting the walls to the METU civil engineering materials laboratory are planned.


Last Updated:
03/10/2022 - 01:46